Desktop|中文
Home About Us Products + News Center Technical Articles Messages Contact Us

Product Details

全自动Dielectric Loss Tester-扬州达瑞

Pumping Speed ≥45L/s SF6 Gas Vacuuming and Filling Device - Yangzhou Darui

Published: 2024-06-30 13:02:32

Views: 2922

Category: SF6 Vacuuming & Recovery

Product Description
Pumping Speed ≥45L/s SF6 Gas Vacuuming and Filling Device 

Darui Electric recommends:



Technical Parameters:



1. Recovery



Initial recovery pressure ≤0.8MPa



Final recovery pressure ≤50KPa



Recovery time: For a 1 m³ SF6 gas volume with an initial pressure of 0.8MPa, recovery to a final pressure of 50KPa takes less than 2.5 hours.



2. Filling



For a 1 m³ SF6 gas volume with an initial pressure of 133Pa, filling to 0.8MPa takes less than 0.8 hours.



3. Vacuuming



The ultimate vacuum of the device is less than or equal to 10 Pa



For a 1 m³ SF6 gas volume with an initial pressure of 0.1MPa, vacuuming to 133Pa takes less than 1.0 hour.



4. Storage



Storage container volume 0.015m³



Product Functions:



1. Vacuuming and vacuum measurement for the device itself, SF6 switches, and GIS



2. Vacuuming and vacuum measurement for liquefaction tanks



3. Vacuuming and vacuum measurement for the device itself



4. Filling SF6 switches



5. Recovery of SF6 gas from electrical equipment, including moisture treatment and oil treatment



6. Drying and purification treatment of recovered and refilled SF6 gas



7. Recovery, liquefaction storage, and residual pressure measurement of SF6 gas in SF6 electrical equipment



8. Can accommodate an 80-liter storage tank inside the device body.



9. Compressed liquid storage of SF6 gas.



10. This device is mobile.



Precautions:



1. Before use, check that all connections are correct and the interfaces are sealed.



2. The oil level of equipment components should be appropriate.



3. The vacuum pump must not run in reverse.



4. Do not open vacuum gauge V9 when there is gas pressure in the equipment.



5. The filter element should be replaced after 5000 hours of operation. The molecular sieve should be replaced after 10000 hours.



6. When recovering gas, the refrigeration system can be turned on 15-30 minutes in advance.



7. When the refrigeration system is turned on, a small amount of condensed water will be discharged, which can be handled appropriately.









Note: The above information and technical parameters are compiled and released by Yangzhou Darui Electric Co., Ltd.

WeChat QR Code
💬
💬 Message ✕

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.
主营产品:Dielectric Loss Tester、Transformer Ratio测试仪、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us